Doc PZ-TRK-0001rev 8aff382Modified 2026-08-21

Production tracker

Every asset, anomaly, system and act in the campaign, and where it stands. Weighted by production cost, so a cheap prop cannot outweigh the work it sits next to.

Tracked items5
Done0
In progress0
Not started5
Systems progress
0 of 0 cost complete
5 items
  1. Inventory and loadoutSystemP1cost 0Not started
    PriorityP1
    CategorySystem
    Cost0 · low
    PhasePhase 2
    • Prototype
    • Implementation
    • Tuning
    • In engine
    Open file →
  2. Mission and objective flowSystemP1cost 0Not started
    PriorityP1
    CategorySystem
    Cost0 · low
    PhasePhase 2
    • Prototype
    • Implementation
    • Tuning
    • In engine
    Open file →
  3. Save and checkpointSystemP1cost 0Not started
    PriorityP1
    CategorySystem
    Cost0 · low
    PhasePhase 2
    • Prototype
    • Implementation
    • Tuning
    • In engine
    Open file →
  4. Audio propagationSystemP1cost 0Not started
    PriorityP1
    CategorySystem
    Cost0 · low
    PhasePhase 2
    • Prototype
    • Implementation
    • Tuning
    • In engine
    Open file →
  5. AI perception and behaviourSystemP1cost 0Not started
    PriorityP1
    CategorySystem
    Cost0 · low
    PhasePhase 2
    • Prototype
    • Implementation
    • Tuning
    • In engine
    Open file →